Pick from pre-defined templates or describe your project in plain language. AI generates a boilerplate Gantt chart complete with phases, tasks, and subtasks — including gap analysis, critical path identification, and dependency mapping. Edit, refine, and publish.
Type a plain-language description — or pick from pre-built industry templates to get a structured baseline instantly.
Pre-built templates:
Description
SME-scale cloud migration: on-prem servers to AWS, file/email to M365, line-of-business apps to SaaS. Wave-based approach.
Critical Path
1. Migration strategy (P1) → 2. IAM setup (P1) → 3. Network design (P1) → 4. Pilot build → 5. Wave 1 production → 6. DNS cutover
Total duration: 84 days
In seconds, the AI produces a structured Gantt chart with phases, subtasks, realistic durations, dependency chains, and critical path identification. It also runs a gap analysis.
Drag bars to change dates, expand durations, add phases or subtasks. Set priorities (P1–P5), update dependencies — changes reflect instantly in the Gantt chart.
Gap Analysis
• No downtime plan — add 2-day buffer
• Furniture lead time conflict with fit-out
Critical Path
Lease → Fit-out → Cabling → Network → Server migration → Move day
62 days
Click Reperform AI Analysis to get an updated critical path, gap analysis, and risk assessment. Keep refining until the schedule is solid.
Save the plan as a full Gantt project. Convert to tracked tasks with two-way sync. Share passcode-protected read-only links with clients and stakeholders.